— Service

Production & Process Optimization.

— Overview

A line rarely needs to be replaced — it needs the actual bottleneck found and fixed. Machton Systems audits existing production lines and processes to find where time, capacity, or output is being lost, then engineers the mechanical and workflow fix directly, rather than handing over a report of recommendations.

Line audit — walking the actual process to find where cycle time, capacity, or yield is being lost.

Engineered fix — mechanical and workflow changes designed to work with your existing equipment, not a generic recommendation.

10-20 %

Cost reduction target

Root – Cause

Improvement methodology

2 – 4 wks

Typical turnaround

Continous

Ongoing support model

Deliverables & where this applies.

Key Deliverables

Line & process bottleneck audit

Workflow & layout optimization

Cycle-time reduction design

DFM for cost-down manufacturing

WHERE THIS APPLIES

Packaging lines Food & FMCG processing Assembly lines Multi-unit production facilities Batch manufacturing

How this is typically engaged.

— Recommended Hourly, Exploratory

Why this fits.

Process issues often reveal themselves only once you’re inside the line — a fix for one bottleneck can surface a second worth addressing. Hourly billing lets the audit and fix go exactly as deep as the floor requires.

Typical duration

Month-to-month

Pricing

Billed Per Hour

Communication

Scheduled check-ins

– Our WORK

Projects from this service.

PRODUCTION OPTIMIZATION

Biscuit Packing Line Optimization

Ergonomic and mechanical redesign of a biscuit packing line, engineered for food-grade compliance and repeatable deployment across units.

Let’s discuss your engineering requirements.

Share your project scope, constraints, and objectives — we’ll outline a structured path forward.